Preparation of an EA for a 34 mile fiber optic line
APS Coconino-Verde 230 kV Fiber Optic Improvement Project
Logan Simpson coordinated with the Coconino National Forest in Arizona and with Arizona Public Service (APS) to prepare an Environmental Assessment (EA) for the APS Coconino-Verde 230kV Fiber Optic Project. In support of these efforts, a biological assessment (BA) and a biological evaluation (BE) were prepared and training materials to minimize impacts to sensitive biological resources were provided. Cultural resource surveys and monitoring were provided.
Project Type
Environmental Planning
Location
Arizona
Highlights
Prepared an EA for the Coconino National Forest
Prepared a Biological Assessment and a Biological Evaluation.
Conducted cultural resource surveys
Conducted pre-construction rare plant surveys